Go To Search
Current Road and Infrastructure Projects
Current Road and Infrastructure Projects
Huntley / Wilson Bridge / Worthington-Galena Road Intersection
Improvements to alleviate congestion and enhance traffic flow at the intersection of Huntley Road / Wilson Bridge Road / Worthington-Galena Road.  Construction is tentatively scheduled for 2019. The project is currently in the alternatives analysis study phase.

Old Worthington Pedestrian Hybrid Beacons
Improvements to pedestrian crossings along High Street in Old Worthington are being proposed, including upgrades to the crossings at Stafford Avenue, Village Green Drive South and Short Street.

2016 Street Improvement Program

Construction of ADA compliant curb ramps & sidewalks, asphalt pavement, planing and overlay, spot curb & gutter replacement, asphalt pavement repair, inlet repair,  concrete roadway repairs.

Tennis and Basketball Court Improvements
Perform surface repairs and painting of tennis and basketball courts at four parks in the City of Worthington.

2016 W South St Sanitary Sewer Repair
Replacement of sanitary sewer pipe and manholes on W South Street between
Garden Drive and Welling Way

2016 Pedestrian Hybrid Beacon Installation
Construction and installation of Pedestrian Hybrid Beacons on N High St, Worthington, Ohio at Stafford Ave, Village Green Dr, and Short St.

Projects Out for Bid

Lining and repair of the sanitary sewer lines located in central Worthington.

Worthington Solid Waste Collection Services
The Collection, Transportation and Delivery for Disposal or Processing of Residential Solid Waste, Recyclable Materials and Yard Waste (“Collection Services”) collected from within the City of Worthington.